TM 9-2320-209-34-2-2 e. Replacement. FRAME 1 Soldiers 1. A and B 2. Soldier A 3. Soldier B 4. END OF TASK Put in 13 floorboards (1). Put in 12 hold down slats (2) and two parts of hold down slat (3). Put in 84 carriage bolts (4). NOTE Washers (5) and nuts (6) may have been replaced with locknuts. Working under truck, put on 84 washers (5) and nuts (6). 1. 2. 3. 4. NOTE Follow-on Maintenance Action Required: Replace A-frame assemblies. Refer to TM 9-2320-209-10. Replace tailgate and troop seat rack assemblies. Referto TM 9-2320-209-10. Replace front and rear end curtains. Refer to Bow and Tarp Kits Installation and Removal, TM 9-2320-209-10. Replace body tarpaulin. Refer to Bow and Tarp Kits Installation and Removal, TM 9-2320-209-10. 17-750
