TM 9-2320-209-34-2-2 FRAME 5 Soldier A Soldier B Soldier A Soldier B 1. Hold center ceiling panel (1) up. 2. Put in 20 screws (2). 3. Put inner window frame (3) in place and hold it. 4. Put in 18 screws (4) around inner window frame (3). 5. Put on clip (5). 1. 2. 3. END OF TASK NOTE Follow-on Maintenance Action Required: Replace dome light and fixture. Refer to TM 9-2320-209-20. Reconnect battery ground cable. Refer to TM 9-2320-209-20. Replace external power cable. Refer to Operation of Shop Van and Instrument Repair Shop Van Trucks, TM 9-2320-209-10. 17-438
