TM 9-2320-209-34-2-2 FRAME 2 Soldiers 1. Put right front ceiling panel (1) in place. A and B Soldier B 2. Hold right front ceiling panel (1). Soldier A 3. Put in 16 screws (2). Soldier B 4. Hold center ceiling panel (3) up. Soldier A 5. Put in 20 screws (4). Soldier B 6. Put inner window frame (5) in place and hold it. Soldier A 7. Put in 18 screws (6) around inner window frame (5). 8. Put on clip (7). NOTE Follow-on Maintenance Action Required: 1. Replace dome light and fixture. Refer to TM 9-2320-209-20. 2. Reconnect battery ground cable. Refer to TM 9-2320-209-20. 3. Replace external power cable. Refer to Operation of Shop Van and Instrument Repair Shop Van END OF TASK Trucks, TM 9-2320-209-10. 17-428
