TM 9-2320-209-34-2-2 FRAME 2 1. Takeout 10 screws (1) holding glove compartment (2) to instrument panel (3). Take out glove compartment. 2. Take out two screws (4) and take off two nuts (5) and washers (6) from support bracket (7). 3. Take out six screws (8) from top of instrument panel (3). 4. Take out four screws (9) from instrument panel (3), two on each side. Take off instrument panel. GO TO FRAME 3 17-19
