TM 9-2320-209-34-2-1 FRAME 6 1. Take out 12 screws (1) and lockwashers (2). 2. Take off two retainers (3). NOTE Keep shims (4) with retainer (3) case so that bearing preload will 3. Take off shims (4). from same side of carrier not be changed. 4. Using micrometer, measure thickness of each pack of shims ( 4). 5. If reading in frame 5 was more than limits given, use a thicker shim (4) or add a shim. 6. If reading in frame 5 was less than limits given, use a thinner shim (4) or take out a shim. 7. Take out through shaft assembly (5). Refer to para 10-7c, frame 10. GO TO FRAME 7 10-74
