TM-9-2320-209-34-2-1 Page 385

TM-9-2320-209-34-2-1 Maintenance Part 1 for M44A1 and M44A2 Series Trucks

Page 385 of 770

TM 9-2320-209-34-2-1 FRAME 2 1. Put in 12 screws and lockwashers (l). 2. Evenly tighten 12 screws and lockwashers (1) to 23 to 26 pound-feet. 3. Take jack out from under truck. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. END OF TASK NOTE Follow-on Maintenance Action Required: Replace transmission power takeoff rod (truck M342A2). Refer to TM 9-2320-209-20. Replace hydraulic hoist pump drive shaft (truck M342A2). Refer to TM 9-2320-209-20. Replace transmission power takeoff rod (trucks with front winch). Refer to TM 9-2320-209-20. Replace front winch drive shaft (trucks with front winch). Refer to TM 9-2320-209-20. Replace transmission-to-transfer propeller shaft. Refer to TM 9-2320-209-20. Replace transfer reverse shift lever rod. Refer to TM 9-2320-209-20. Replace clutch control rod. Refer to Clutch Linkage Assembly, TM 9-2320-209-20. Put in new front and intermediate cab tunnels. Refer to TM 9-2320-209-20. Put in new transmission gearshift lever. Refer to TM 9-2320-209-20. Fill transmission. Refer to LO 9-2320-209-12/1. 8-28