TM 9-2320-209-20-3-4 FRAME 2 Soldier A 1. Soldiers 2. A and B Soldier C 3. 4. Soldiers 5. A and B GO TO FRAME Hook snatch block (1) on center of spreader tube on A-frame (2). Lift up A-frame (2) until soldier C has enough slack to put end loop of cable (3) on pintle hook (4) and hold A-frame in place. When there is enough slack in cable (3), put eyebolt (5) over loop end of cable. Open pintle hook (4) and put looped end of cable around pintle hook as shown. Put washer (6) and plate (7) on back of truck and aline screw hole. Put eyebolt (5) in place. Tell soldiers A and B when finished. Lower A-frame (2) to position shown. 3 23-130
