TM 9-2320-209-20-3-4 FRAME 3 Soldier A 1. 2. 3. 4. 5. 6. 7. 8. While soldier B is shifting power divider control lever (1), watch linkage control rod (2). If power divider control lever (1) goes into all four positions and linkage control rod (2) does not touch transfer transmission case (3), no adjustment is needed. If power divider control lever (1) does not go into all four positions or if linkage control rod (2) touches transfer transmission case (3) or flange (4), do steps 4 through 8. Using 5/8-inch wrench, loosen nuts (5) at each end of linkage con- trol rod (2). Take off control rod assembly (2). Refer to para 19-26b. Using 5/8-inch wrench, turn clevis rod ends (6) in or out as needed and tighten nuts (5). Put back control rod assembly (2). Refer to para 19-26c. If needed, do steps 4 through 7 again. NOTE If adjustment cannot be made or if power divider shifter shaft (7) requires adjustment, tell direct support main- tenance. Follow-on Maintenance Action Required: Replace front and rear tunnel. Refer to Part 3, para 18-5. END OF TASK 19-142