TM-9-2320-209-20-3-3 Page 87

TM-9-2320-209-20-3-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 87 of 548

TM 9-2320-209-20-3-3 FRAME 3 1. Put cable (1) on valve lever (2) so it will be held by U-bolt (3). Put U-bolt through holes in valve lever. 2. Put plate (4) onto U-bolt (3). Start two nuts (5) onto U-bolt. 3. Using pliers, pull cable (1) through U-bolt (3) to take out most of the slack. While holding cable, using 7/16-inch wrench, tighten two nuts (5). END OF TASK 18-72