TM-9-2320-209-20-3-3 Page 69

TM-9-2320-209-20-3-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 69 of 548

TM 9-2320-209-20-3-3 b. Replacement. FRAME 1 1. Put lifting sling (1) through tailgate steps (2 and 3). Hook both ends of lifting sling to hook on hoist. 2. Raise hoist to put tailgate (4) on truck as shown. GO TO FRAME 2 18-54