TM 9-2320-209-20-3-3 1. Put latch (1) in place. 2. Using screwdriver, screw in and tighten four washers (2) and screws (3) . 3. Put plate (4) in place. 4. Using screwdriver, screw in and tighten four washers (5) and screws (6) . 5. Put clip (7) in place and using screwdriver, screw in and tighten two screws (8). NOTE Follow-on Maintenance Action Required: Replace van doors on truck. Refer to para 18-75. END OF TASK 18-421
