TM-9-2320-209-20-3-3 Page 143

TM-9-2320-209-20-3-3 Maintenance Part 3 for M44A1 and M44A2 Series Trucks

Page 143 of 548

TM 9-2320-209-20-3-3 FRAME 2 1. Push lever (1) down so shaft (2) and fusible link (3) line up. Put fusible link on shaft. 2. Put cotter pin (4) through hole in shaft (2). Using pliers, bend open ends of cotter pin. 3. Using pliers, hook fusible link release spring (5) in hole in lever (1). 4. Using pliers, hook emergency release control spring (6) in hole in lever (7). END OF TASK 18-128