TM-9-2320-209-20-3-2 Page 453

TM-9-2320-209-20-3-2 Maintenance Part 2 for M44A1 and M44A2 Series Trucks

Page 453 of 552

TM 9-2320-209-20-3-2 FRAME 4 1. Put two spacers (1) onto spare wheel carrier (2). Line up screw holes. 2. Open tool box (3). Set tool box down on spacers (1). Line up screw holes. 3. Put six screws (4) down through holes in tool box (3) and through spacers (1) and spare wheel carrier (2). 4. Using 9/16-inch wrench, hold screws (4). Using 9/16-inch wrench, screw on and tighten four nuts (5). GO TO FRAME 5 16-32