TM 9-2320-209-20-3-2 CHAPTER 15 STEERING SYSTEM GROUP MAINTENANCE Section I. SCOPE 15-1. EQUIPMENT ITEMS COVERED. This chapter gives equipment maintenance procedures for the mechanical steering gear assembly for which there are authorized corrective maintenance tasks at the organizational maintenance level. 15-2. EQUIPMENT ITEMS NOT COVERED. All equipment items for which corrective maintenance is authorized at the organizational maintenance level are covered in this chapter. Section II. MECHANICAL STEERING GEAR ASSEMBLY 15-3. FRONT WHEEL ALINEMENT. TOOLS: Toe-in gage 15/16-inch wrench Pipe wrench SUPPLIES: None PERSONNEL: Two EQUIPMENT CONDITION: Truck parked on smooth level ground, wheels in straight ahead position, engine off, handbrake set. a. Preliminary Procedures. (1) Inflate front tires to correct pressure. Refer to TM 9-2320-209-10. (2) Check wheel bearing adjustment. Refer to para 14-3. 15-1
