TM-9-2320-209-20-3-1 Page 470

TM-9-2320-209-20-3-1 Maintenance Part 1 for M44A1 and M44A2 Series Trucks

Page 470 of 830

TM 9-2320-209-20-3-1 FRAME 4 Soldier A 1. Aline holes in bracket (1) with holes in firewall (2). Soldier B 2. Put two bolts (3) through holes in firewall (2) and using 7/16-inch wrench, hold bolts while soldier A screws on locknuts (4). Soldier A 3. Using 7/16-inch wrench, screw on and tighten two locknuts (4). NOTE Follow-on Maintenance Action Required: 1. Reconnect battery ground cable. Refer to para 7-58. 2. Test starter pedal and linkage by pushing pedal several times. Check that linkage moves freely without binding. 3. Close hood and slide panels. Refer to TM 9-2320-209-10. END OF TASK 7-34