TM-9-2320-209-20-3-1 Page 258

TM-9-2320-209-20-3-1 Maintenance Part 1 for M44A1 and M44A2 Series Trucks

Page 258 of 830

TM 9-2320-209-20-3-1 FRAME 2 1. Put end of connecting link (1) through hole in lever assembly (2) as shown. Put cotter pin (3) through hole in end of connecting link. Using pliers, spread cotter pin. 2. Place lever assembly (2) in bracket (4) as shown. Put headless pin (5) through holes in bracket and lever assembly. 3. Put two cotter pins (6) through holes in headless pin (5). Using pliers spread cotter pins . 4. Put stud of ball joint (7) through hole in lever assembly (2) as shown. Using 1/2-inch wrenches, screw on and tighten locknut (8). GO TO FRAME 3 TA 047148 4-170