TM9-2320-209-10-2/TO 36A12-1B-1091-2 Table 4-1. Operator/Crew Preventive Maintenance Checks and Services for Special Purpose Kits - Cent NOTE: These checks are to be made in the order listed, within designated interval. B-Before operation A-After operation M-Monthly D-During operation W-Weekly Interval Item Item to be Inspected Equipment is No. Procedure: Check for and have repaired, filled, not ready/ B D A w M or adjusted as needed available if: 3 A-FRAME KIT ● a. Before operating A-frame (1) , make sure it is positioned at about a 60° angle and is securely attached to the front bumper ancl the inverted pintle hook (2) . Also check that: ● Cable clamps (3) are not loose Cable is frayed ● Cable assembly (4) is not frayed or broken. or broken TA 045372 WARNING Use leather gloves when checking winch cable. Injury to hands may result if gloves are not worn. ● b. Inspect A-frame ( 1) for bends and winch cable (5) for kinks, frays, and breaks. Chanae 1 4-7 /(4-8 hlankl
