TM 9-2320- 209-10-2 Table 1-8. Operator/Crew Preventive Maintenance Checks and Services for M756A2 Pipeline Construction Truck - Cent NOTE : These checks are to Item No. 3 4 B-Before operation D-During operation B — ) D Interval D . — A w — ● — M be made in the order listed, within designated interval. A-After operation W-Weekly M-Monthly Item to be Inspected Procedure: Check for and have repaired, tilled, or adjusted as needed REAR WINCH a. Visually check rear winch drive chain (1) for damage. TA 045347 b. Check that rear winch shear pin (2) is in place and serviceable (located on back side of sprocket). A FRAME Check that A-Frame parts are not missing, broken, or damaged. Equipment is not ready/ available if: A-Frame cannot be used due to damaged or missing parts. 1-30