TM 9-2320-209-10-1 1. Place truck so that derrick sheave (1) is almost touching pole (2). 2. Operate rear winch (3) to let out some slack in winch cable (4). (Refer to para 4-15d.) 3. Tie winch cable (4) to pole (2) about 2 feet above the balance point. 4. Place outriggers (5) in position on ground. (Refer to para 4-15b.) GO TO FRAME 3 4-370