TM 9-2320-209-10-1 1. Rig the winch cable (l) for derrick operation. (Refer to para 4-15f.) 2. Raise the derrick tube (2). (Refer to para 4-15c.) 3. Make winch cable (1) fast to pole (3), slightly above balance point (4). 4. Operate rear winch (5) slowly to lift pole (3). (Refer to para 4-15d.) 5. Stop the winch when pole (3) is just clear of ground and in position over hole (6). GO TO FRAME 3 4-366 3? U.S. GOVERNMENT PRINTING OFFICE: 1989 643-025/80123 PIN: 046723-001