TM 9-2320-209-10-1 FRAME 3 1. Lift boring machine control lever locking latch (1). 2. Let feed control lever (2) and drive control lever (3) go to NEUTRAL position. 3. Move feed control lever (2) forward and drive control lever (3) back (position 5, table 4-3). Let rack bar (4) move up until it is out of auger. 4. Let feed control lever (2) and drive control lever (3) return to NEUTRAL. GO TO FRAME 4 4-354