TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download
Page 96 of 856
REMOVAL - Continued 4. Open access cover (Figure 2, Item 10) in upper container half (Figure 2, Item 3) and remove desiccant bags from access port (Figure 2, Item 8). Discard desiccant. 3 10 8 9 MAINT_016 Figure 2. Container and Nonmetallic Seal. END OF TASK INSTALLATION NOTE Container (NSN 8145-00-138-7809) for model 5063-5299 requires 62 units of Class 1 desiccant. Container (NSN 2815-01-232-9447) requires 128 units of Class 1 desiccant. 1. Install Class 1 desiccant through access port (Figure 2, Item 8) in upper container half (Figure 2, Item 3) and screw access cover (Figure 2, Item 10) onto port. WARNING Never crawl under equipment when performing maintenance unless equipment is securely blocked. Keep clear of equipment when it is being raised or lowered. Do not allow heavy components to swing while suspended by lifting device. Exercise caution when working near a cable or a chain under tension as equipment may drop or shift. Failure to comply may result in injury to personnel. 2. Inspect container nonmetallic seal (Figure 2, Item 9) for cuts, cracks, or other damage. Discard nonmetallic seal if unserviceable and install a new nonmetallic seal. TM 9-2815-205-24 0010 0010-4