TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 758 of 856

8. Immerse cylinder block in water heated to 180–200°F (82–93°C) for 20 minutes. WARNING Wear eye protection when working with pressurized air system. Make certain air pressure is fully vented before disassembly. Sudden release of air pressure can throw debris. Failure to comply may result in injury to personnel. 9. Apply 40 psi (276 kPa) air pressure to water jacket and observe water in tank for bubbles which indicates a crack or leak in block. Replace block if cracked. 10. After completing pressure test, release air pressure and remove block from water tank. Remove plates, seals, liners, and gaskets from cylinder block. WARNING Compressed air used for cleaning purposes will not exceed 30 PSI (207 kPa). Use only with protective equipment (goggles, face shield, gloves, etc.). Failure to comply may result in injury to personnel. 11. Blowout all passages in block with compressed air. 12. Dry cylinder liners with compressed air and coat with lubricating oil to prevent rust from forming. END OF TASK FOLLOW ON TASK 1. Install crankshaft (WP 0097). 2. Install cylinder liners (WP 0097). 3. Install cylinder kits (models 5063-5392, 5063-5393, and 5063-539L) (WP 0095). 4. Install cylinder kits (model 5063-5299) (WP 0094). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0098 0098-16