TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 696 of 856

INSTALLATION - Continued NOTE If necessary, pry connecting rods apart before measuring side clearance. 10. Using thickness gage, measure side clearance between each pair of connecting rods (Figure 18, Item 18). Clearance limits are 0.008–0.016 inch (0.20–0.41 mm). 11. Repeat Steps 1–10 to install additional liners, pistons, and rod assemblies. Use cylinder liner hold-down clamp (Figure 18, Item 1) to hold installed liners in place. 12. Remove all cylinder liner hold-down clamps (Figure 18, Item 1). 18 1 MAINT_370 Figure 18. Piston Cylinder Liner Hold-Down Clamp. END OF TASK FOLLOW ON TASK 1. Install cylinder head (WP 0073). 2. Install oil pump inlet tubes (model 5063-5299) (WP 0064). 3. Install oil pan (WP 0063). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0094 0094-22