TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download
Page 493 of 856
ADJUSTMENT 2. Move injector control tube (Figure 9, Item 14) in direction of FULL FUEL. 3. Align throttle delay piston (Figure 9, Item 33) flush with edge of throttle delay cylinder (Figure 9, Item 32). CAUTION Do not overtighten two U-bolt nuts. Damage to injector control tube or U-bolt clamp could result. 4. Tighten two nuts (Figure 9, Item 13) on U-bolt (Figure 9, Item 15) snug. 5. Move injector rack from NO-FUEL to FULL FUEL position. There should be no binding during movement of injector control tube (Figure 9, Item 14). Torque nuts (Figure 9, Item 13) to 84–108 lb-in (9–12 N·m). 33 13 31 32 12 15 27 14 FULL FUEL MAINT_222 Figure 9. Throttle Delay Adjustment. END OF TASK FOLLOW ON TASK 1. Install rocker arm covers (models 5063-5392, 5063-5393, and 5063-539L) (WP 0053). 2. Install rocker arm covers (model 5063-5299) (WP 0052). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0078 0078-9/blank