TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 462 of 856

INSTALLATION - Continued NOTE Repeat tightening sequence at least once because first bolts tightened tend to lose significant clamping load during tightening of remaining bolts. Apply a steady pressure for two or three seconds at prescribed torque to allow bolts to turn while gaskets yield to their designed thickness. 10. Torque cylinder head bolts (Figure 1, Item 1) to 170–180 lb-ft (231–244 N·m) in 50 lb-ft (68 N·m) increments. Tighten bolts in alphabetical sequence shown (Figure 4). 11. Repeat Steps 3–10 for left side. TOP E G H F B D A C BOTTOM MAINT_203 Figure 4. Cylinder Head Torque Sequence. END OF TASK FOLLOW ON TASK 1. Install injector control tubes (WP 0072). 2. Install fuel rod hoses (WP 0062). 3. Install throttle control rods (WP 0061). 4. Install engine rocker arm covers (models 5063-5392, 5063-5393, and 5063-539L) (WP 0053). 5. Install engine rocker arm covers (model 5063-5299) (WP 0052). 6. Install fuel lines (models 5063-5393 and 5063-539L) (WP 0051). 7. Install fuel lines (model 5063-5392) (WP 0050). 8. Install fuel lines (model 5063-5299) (WP 0049). 9. Install water outlet elbow and thermostat housing (models 5063-5393 and 5063-539L) (WP 0048). 10. Install water outlet elbow and thermostat housing (models 5063-5299 and 5063-5392) (WP 0047). 11. Install exhaust manifolds (WP 0039). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0073 0073-6