TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download
Page 431 of 856
INSTALLATION NOTE Four screws (Figure 1, Item 12) must be temporarily installed prior to torquing screws (Figure 1, Item 9) to ensure proper alignment of front support (Figure 1, Item 7). 1. Install front support (Figure 1, Item 7), four screws (Figure 1, Item 12), two screws (Figure 1, Item 9), and two new lockwashers (Figure 1, Item 10) on lower front cover (Figure 1, Item 6). Torque screws (Figure 1, Item 9) to 46–50 lb-ft (62–68 N·m). Remove four screws (Figure 1, Item 12). 2. Slide preformed packing (Figure 1, Item 11) on support (Figure 1, Item 7). 3. Install engine support (Figure 1, Item 8), two screws (Figure 1, Item 3), two new lockwashers (Figure 1, Item 4), and cap (Figure 1, Item 5) on preformed packing (Figure 1, Item 11) and front support (Figure 1, Item 7). Torque screws to 46–50 lb-ft (62–68 N·m). 4. Install bracket (Figure 1, Item 1), four screws (Figure 1, Item 12), four new lockwashers (Figure 1, Item 13), and eight flat washers (Figure 1, Item 2) on front support (Figure 1, Item 7). Torque screws to 46–50 lb-ft (62–68 N·m). END OF TASK FOLLOW ON TASK 1. Install crankshaft hub (WP 0067). 2. Install solenoid valve and bracket (WP 0043). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0069 0069-3/blank