TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 301 of 856

INSPECTION-ACCEPTANCE AND REJECTION CRITERIA Inspect igniter, nozzle, and air box heater for cracks, pitting, or wear. END OF TASK ASSEMBLY 1. Install nozzle (Figure 2, Item 7) in air box heater (Figure 2, Item 5). Tighten securely. 2. Install igniter (Figure 2, Item 8) in air box heater (Figure 2, Item 5). Tighten securely. 3. Install elbow (Figure 2, Item 9) in fuel inlet port of air box heater (Figure 2, Item 5). 4. Install connector (Figure 2, Item 11) and elbow (Figure 2, Item 10) in air inlet port of air box heater (Figure 2, Item 5). END OF TASK ADJUSTMENT NOTE Test igniter and ignition coil simultaneously (WP 0043) and (WP 0044). Using a thickness gage, adjust igniter-wire air gap to 0.080 inch (2.03 mm) (Figure 3). 0.080 in. (2.03 mm) MAINT_138 Figure 3. Air Box Heater Adjustment. END OF TASK TM 9-2815-205-24 0046 0046-5