TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download
Page 284 of 856
INSTALLATION - Continued 10. Connect terminals of harness assembly (Figure 8, Item 13) to solenoid valve (Figure 8, Item 19) and top of ignition coil (Figure 8, Item 14). 11. Install two leads of harness assembly (Figure 8, Item 13), two new lockwashers (Figure 8, Items 25 and 27), and two nuts (Figure 8, Items 24 and 26) on air pump (Figure 8, Item 15). 12. Install three ground wires of harness assembly (Figure 8, Item 13), new copper flat washer (Figure 8, Item 17), and bolt (Figure 8, Item 18) in air box heater (Figure 8, Item 21). Torque bolt to 13–17 lb-ft (18–23 N·m). 13. Install terminal of harness assembly (Figure 8, Item 13), clip (Figure 8, Item 10), screw (Figure 8, Item 12), two flat washers (Figure 8, Item 11), new lockwasher (Figure 8, Item 29), and nut (Figure 8, Item 28) in top of bracket (Figure 8, Item 30). Torque nut to 30–35 lb-ft (41–47 N·m). 14. Connect ignition wire (Figure 8, Item 16) to spark igniter (Figure 8, Item 20) and bottom of ignition coil (Figure 8, Item 14). 15. If removed, install adapter (Figure 8, Item 2) in hose (Figure 8, Item 8). 16. Install check valve (Figure 8, Item 9) in hose (Figure 8, Item 8). Connect adapter (Figure 8, Item 2) to elbow (Figure 8, Item 3) in air box heater (Figure 8, Item 21). Tighten adapter. 17. Place check valve (Figure 8, Item 9) in loop clamp (Figure 8, Item 1) and install loop clamp, flat washer (Figure 8, Item 6), new lockwasher (Figure 8, Item 5), and screw (Figure 8, Item 4) into front cover (Figure 8, Item 7). Torque screw to 30–35 lb-ft (41–47 N·m). 18. Install wire wrap (Figure 8, Item 23) around ignition wire (Figure 8, Item 16), hose (Figure 8, Item 22), and harness assembly (Figure 8, Item 13). TM 9-2815-205-24 0044 0044-10