TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 262 of 856

INSTALLATION - Continued 17. If removed, install clip (Figure 9, Item 6), clip (Figure 9, Item 3), and wire wrap (Figure 9, Item 10) on hose assembly (Figure 9, Item 4). 18. Connect fuel inlet hose assembly (Figure 9, Item 4) to elbow (Figure 9, Item 1) in solenoid valve (Figure 9, Item 2) and tee (Figure 9, Item 5). Tighten connection. 19. Install clip (Figure 9, Item 6), flat washer (Figure 9, Item 7), new lockwasher (Figure 9, Item 9), and screw (Figure 9, Item 8) on lower front cover. Torque screw to 30–35 lb-ft (41–47 N·m). 1 2 3 4 5 6 7 9 10 4 8 MAINT_114 Figure 9. Air Box Heater Fuel Line Installation. END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0042 0042-10