TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download

Page 244 of 856

INSTALLATION - Continued a. Loop new wire around first capstan (Figure 4, Item 20) and apply two twists using wire twister pliers. b. While holding insulation blanket in place by hand, place ends of new wire on each side of adjacent capstan (Figure 4, Item 21) and apply at least two more twists using wire twister pliers. c. Trim new wire 3/4 inch (20 mm) from second capstan (Figure 4, Item 21). 20 21 MAINT_101 Figure 4. Insulation Blanket Installation. d. Repeat Steps 6.a. – 6.c. for remaining pairs of capstans on all blankets. END OF TASK FOLLOW ON TASK Install turbocharger (WP 0036). END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0038 0038-4