TM-9-2815-205-24 Technical Manual for M113 Engine 6V53 6V53T Download
Page 107 of 856
INSTALLATION - Continued 8. If removed, install clamp (Figure 8, Item 10) on tube (Figure 8, Item 7). 9. Slide two hoses (Figure 8, Item 6) and four clamps (Figure 8, Item 5) onto tube (Figure 8, Item 7) and then over water pump (Figure 8, Item 14) and transmission cooler (Figure 8, Item 4) connections. Tighten clamps securely. 10. Install bracket (Figure 8, Item 9), bolt (Figure 8, Item 15), new lockwasher (Figure 8, Item 18), flat washer (Figure 8, Item 17), and nut (Figure 8, Item 19) to fan support bracket (Figure 8, Item 16). Torque bolt to 30–35 lb-ft (41–47 N·m). 11. Install screw (Figure 8, Item 8), clamp (Figure 8, Item 10), flat washer (Figure 8, Item 11), new lockwasher (Figure 8, Item 12), and nut (Figure 8, Item 13) to bracket (Figure 8, Item 9). Torque screw to 46–50 lb-ft (62–68 N·m). 4 5 6 5 7 9 10 11 8 12 13 14 15 16 19 17 18 5 5 6 MAINT_025 Figure 8. Transmission Oil Cooler Installation. END OF TASK END OF WORK PACKAGE TM 9-2815-205-24 0011 0011-9/blank