TM-9-2540-207-14&P Sustainment Manual for A20 Heater for M113 2540-01-396-2826 Download

Page 25 of 288

TM 9-2540-207-14&P 1-7 Shipping Container (continued) If the shipping container appears damaged, inspect the contents and look for dents on the exterior of the heater. There are no loose parts in a functional heater. ! CAUTION ! When transporting the heater, ensure it is done so in the correct orientation, as depicted in Figure 1.4-1. 1.5 Heater Operation Verification To unpack the heater, complete the following steps: 1. Open the box. 2. Verify contents: (1) Fully Assembled Heater NSN: 2540-01-396-2826. Note: The Vent Outlet Seal is shipped loose in the plastic bag to avoid shipping damage from the protective end packaging material. 3. Lift out top packaging brace. 4. Lift out the heater (enclosed in the sealed plastic bag) and end packaging pieces. 5. Remove the two end packaging pieces and remove the heater and seal from the plastic bag and install the Vent Outlet Seal. 6. Remove the plastic cap from the fuel inlet. 7. Save all packaging for shipping or storage. ! CAUTION ! When handling the heater be careful NOT to damage the rubber Outlet Seal on the Ventilation Air Outlet end as this will affect performance of the heater when installed! 1.6 Tools And Supplies The equipment described does NOT require Metric tools. Operator and Maintenance Instructions are provided using Imperial/SAE units. For informational purposes, a Metric conversion table is included on inside back cover.