TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download
Page 99 of 620
TM 9-2520-272-40 0014 3. Install wiring harness connector body (Figure 4, Item 5) into transmission center housing opening (Figure 4, Item 12) with key (Figure 4, Item 14) in receptacle (Figure 4, Item 15) located at bottom. 4. Install four new No. 4-40 x 7/16 inch screws (Figure 4, Item 6) holding wiring harness connector body (Figure 4, Item 5) and new gasket (Figure 4, Item 10) to transmission. 5. Torque four screws (Figure 4, Item 6) to 3 to 5 lb-in. (0.3 to 0.6 N·m). Figure 4. Wiring Harness Connector Body Installation. END OF TASK 0014‐5