TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download
Page 70 of 620
TM 9-2520-272-40 0007 2. Put top cover (Figure 3, Item 4) on transmission. 3. Install f fteen 5/16-18 x 3-1/2-inch machine bolts (Figure 3, Item 3) to attach top cover (Figure 3, Item 4) to transmission. 4. Install two 5/16-18 x 1-3/4-inch machine bolts (Figure 3, Item 1) to attach top cover (Figure 3, Item 4) to transmission. 5. Install nine 5/16-18 x 2-inch machine bolts (Figure 3, Item 2) to attach top cover (Figure 3, Item 4) to transmission. 6. Torque machine bolts (Figure 3, Item 1) and (Figure 3, Item 2) and (Figure 3, Item 3) to 13 to 15 lb-ft (18 to 20 N·m). Figure 3. Transmission Top Cover Installation. FOLLOW-ON MAINTENANCE 1. If transmission is to be installed in a vehicle, install oil f ll tube assembly. Reference the Replace Oil Fill Tube Assembly WP in Field Maintenance manual, TM 9-2350-277-13&P. 2. If transmission is to be installed in shipping container, attach oil f ll tube assembly to input housing. Reference Remove/Install Transmission Assembly from/into Container WP in Field Maintenance manual, TM 9-2350-277-13&P. END OF TASK END OF WORK PACKAGE 0007‐4