TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download
Page 537 of 620
TM 9-2520-272-40 0067 MANDATORY REPLACEMENT PARTS Replace parts that may be deformed during use or damaged during removal. SUCH ITEMS SHOULD BE DISCARDED WHEN THEY ARE REMOVED. Replacement items used in reassembly must be new. Parts listed in Table 1 will be replaced each time they are removed in transmission disassembly: Table 1. Mandatory Replacement Parts. Gaskets Oil seals Locknuts O-rings Lockstrips Preformed packings Lockwashers Tab washers Mandatory Replacement Parts in Event of Metal Contamination In addition to standard replacement parts listed in Table 1, the following MINIMUM repair and replacement must be performed in all cases of metal contamination: 1. Replace the hydrostatic pump and motor. 2. Replace the control valve assemblies. 3. Replace the bevel gear assembly, including oil pumps. 4. CLEAN AND INSPECT ALL PARTS. Replace parts as necessary. END OF TASK PARTS REQUIREMENTS FOR EQUIPMENT CONDITIONS 1. The headings of maintenance tasks contain lists of Equipment Conditions. The Equipment Conditions category provides names and locations of other procedures to be completed before you can start work on your assigned task. 2. When Equipment Conditions are needed only to gain access to a work area, examine the items in Materials/Parts category of the initial setup. Select only the supplies and parts needed to complete your work requirement. END OF TASK LOCALLY FABRICATED SHOP AIDS When a maintenance task includes an item to be fabricated, the item is listed under the heading Tools and Special Tools. These fabricated shop aids are listed in Illustrated List of Manufactured Items, WP 0075, including instructions for manufacturing the item. END OF TASK REPAIR PARTS Repair parts are listed and illustrated in TM 9-2520-272-40P, Repair Parts and Special Tools List for Cross-Drive Transmission with Container, Model X200-4A. END OF TASK 0067‐9