TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download

Page 511 of 620

TM 9-2520-272-40 0062 SUSTAINMENT MAINTENANCE FINAL ADJUSTMENTS OVERVIEW INITIAL SETUP: NOT APPLICABLE SCOPE This work package contains a list of applicable work packages to refer to when performing f nal static checks and adjustments required after maintenance actions have been completed and prior to use, shipment, or storage. Final static checks and adjustments shall be performed after maintenance actions have been completed and prior to use, shipment, or storage. Functional tests shall be performed with the transmission coupled to the engine and the power pack installed in the vehicle. (Refer to the vehicle manual.) Functional tests must include correct oil and level and a thorough inspection for oil leaks, steering adjustment check, and brake adjustment check. Maintenance records shall be reviewed for complete and correct entries. Refer to Table 1 for a list of work packages that describe f nal adjustment procedures. Table 1. Final Adjustment Procedures by Work Package. Procedure Work Package Check Output Shaft Drag, Left and Right WP 0063 Torque Wrench Check WP 0064 Adjust Left Brake WP 0065 Adjust Right Brake WP 0066 END OF WORK PACKAGE 0062-1/2 blank