TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download

Page 505 of 620

TM 9-2520-272-40 0060 NOTE Leave sling hooked to hydrostat so that, using hoist and trestle, you can raise and turn hydrostat as necessary to align bolt holes. 8. Install six bolts (Figure 10, Item 3) and six washers (Figure 10, Item 4) in hydrostat (Figure 10, Item 6). 9. Remove hoist, S-chain hook, and eyebolt (Figure 10, Item 2) from hydrostat (Figure 10, Item 6). 10.Torque six bolts (Figure 10, Item 3) to 36 to 43 lb-ft (49 to 68 N·>m). Figure 10. Hydrostat Installation. END OF TASK END OF WORK PACKAGE 0060-7/8 blank