TM-9-2520-272-40 Direct Support for M113A3 X200-4A Transmission 2520-01-397-1074 Download
Page 308 of 620
TM 9-2520-272-40 0039 NOTE When you attach the multiple-leg sling to three studs at approximately equal distances apart, there will be seven studs between sling lugs in two places and eight studs between sling lugs in one place. 19.Put three lugs of the multiple-leg sling (Figure 8, Item 25) over studs (Figure 8, Item 21) that are at equal distances apart on the converter pump assembly (Figure 8, Item 17), and install three 5/16-24 inch hex nuts (Figure 8, Item 22) and three 5/16 inch washers (Figure 8, Item 23). Tighten the nuts with your f ngers. 20.Tap on the converter pump assembly (Figure 8, Item 17) as you pull up on the pump with the multiple-leg sling (Figure 8, Item 25). Remove the converter pump assembly (Figure 8, Item 17). 21.Remove three 5/16-24 inch hex nuts (Figure 8, Item 22), three 5/16 inch washers (Figure 8, Item 23), and the multiple-leg sling (Figure 8, Item 25) from the converter pump assembly (Figure 8, Item 17). Figure 8. Converter Pump Assembly Removal. 0039‐8