TM-9-2520-254-34 Direct Support for M113 TX100-1 Transmission 2520-00-066-4240 Download
Page 70 of 126
Figure 5-54. Figure 5-56. 5-9. Cleaning Refer to paragraph 5-2 for cleaning recom- mendations. 5-10. Inspection and Repair Refer to paragraph 5-3 for general inspection and repair recommendations. Repair and overhaul (rebuild) points of measurement for fits, clearances, and wear limits are indicated by small letters in figure 5-53. Refer to paragraph 6-3 and table 6-3 for wear limits information. 5-11. Assembly All items not covered in a through c below are installed as outlined in paragraph 5-58, steps 31 through 38 (fig. 5-114 through 5-121). No overhaul (rebuild) of such components is required or recommended. a. Lockup Clutch Assembly (fig. 5-53). (1) If bushing (5) in converter pump cover hub was removed, use replacer 5120-572-8656 and handle 5120-316-9182 (fig. 5-57) to install new bushing. (2) Install seal retainer (6) on converter pump cover (4) hub with larger diameter toward open end of cover. Install oil seal ring (7). (3) Install piston seal ring (10) in groove of lockup clutch piston (8) outside diameter. (4) Insert lockup clutch piston (fig. 5-58) into converter pump cover with stamped balance marks (if any) alined so that piston guide pins will enter nearest holes in piston. Figure 5-55.-Flattening lock strip tab. 5-20