TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 271 of 472
SUSTAINMENT MAINTENANCE REPLACE CABLE ASSEMBLIES W117 AND W118 INITIAL SETUP: Tools and Special Tools Electronic Equipment Tool Kit (WP 0069, Item 28) Materials/Parts Lockwasher (12) Personnel Required Radio Repairer 29E10 Equipment Condition External communication box removed from carrier (TM 9-2350-277-13&P) REMOVAL NOTE Tag all cables before disconnecting them for proper installation later. 1. Remove 12 screws (Figure 1, Item 2), lockwashers (Figure 1, Item 1), and J101 connector (Figure 1, Item 5), and J102 connector (Figure 1, Item 6) from the external communication box A11 (Figure 1, Item 4). Discard lockwashers. 2. Remove W117 cable assembly (Figure 1, Item 7) and W118 cable assembly (Figure 1, Item 3) from connector J102 (Figure 1, Item 5) from the external communication box A11 (Figure 1, Item 4). 3. Remove cable W117 (Figure 1, Item 7) and W118 cable (Figure 1, Item 3) from external communication box A11 (Figure 1, Item 4). Figure 1. W117 and W118 Cable Assemblies – Removal. END OF TASK TM 9-2350-277-40&P 0037.4 0037.4‐1 CHANGE 1