TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 268 of 472

INSTALLATION 1. Install W115 cable assembly into carrier. Have helper assist. 2. Connect W115 cable assembly, plug P106 (Figure 4, Item 16) to jack J136 (Figure 4, Item 15) on signal patch panel box A10 (Figure 4, Item 14). Figure 4. Cable/Signal Patch Panel – Connect. 3. Push W115 cable down through hull top plate (Figure 5, Item 3), and through bottom of external communication box A11 (Figure 5, Item 2). Have helper assist. 4. Connect leads (Figure 5, Item 8) to 16 binding posts (Figure 5, Item 7) on faceplate (Figure 5, Item 6). 5. Install faceplate (Figure 5, Item 6) on external communication box A11 (Figure 5, Item 2). Secure with 14 new lockwashers (Figure 5, Item 4) and screws (Figure 5, Item 5). 6. Close and secure lid (Figure 5, Item 1) on external communication box A11 (Figure 5, Item 2). Figure 5. Bundle and Faceplate – Installation. TM 9-2350-277-40&P 0037.3 CHANGE 1 0037.34