TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 261 of 472

INSTALLATION 1. Install cable assemblies in carrier. Have helper assist. 2. Connect W111 cable, plug P1 (Figure 4, Item 11) to jack J115 (Figure 4, Item 17) on signal patch panel box A10 (Figure 4, Item 18). 3. Connect W112 cable, plug P1 ( (Figure 4, Item 5) to jack J116 (Figure 4, Item 17) on signal patch panel box A10 (Figure 4, Item 18). 4. Connect W113 cable, plug P1 (Figure 4, Item 10) to jack J117 (Figure 4, Item 17) on signal patch panel box A10 (Figure 4, Item 18). 5. Connect W114 cable, plug P1 (Figure 4, Item 6) to jack J118 (Figure 4, Item 17) on signal patch panel box A10 (Figure 4, Item 18). Figure 4. RF Cable/External Communications Box – Connect. TM 9-2350-277-40&P 0037.2 0037.25 CHANGE 1