TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 256 of 472

3. Install W101 cable, jack J103 (Figure 4, Item 9) and/or W102 cable, jack J104 (Figure 4, Item 10) in carrier and route through hole in hull top plate (Figure 4, Item 8) up into base of external communications box A11 (Figure 4, Item 2). Have helper assist. 4. Connect W101 cable, jack J103 (Figure 4, Item 9) with two bushings (Figure 4, Item 11), on faceplate (Figure 4, Item 15) LAN A, secure with jam nut (Figure 4, Item 12). 5. Connect W102 cable, jack J104 (Figure 4, Item 10) with two bushings (Figure 4, Item 11), on faceplate (Figure 4, Item 15) LAN B, secure with jam nut (Figure 4, Item 12). 6. Secure W101 cable (Figure 4, Item 9) and/or W102 (Figure 4, Item 10) to hull with two clamps (Figure 4, Item 4), screws (Figure 4, Item 5), four washers (Figure 4, Item 6), and two new locknuts (Figure 4, Item 7). 7. Secure slack in cable with new tie straps (Figure 4, Item 3) as required. 8. Install faceplate (Figure 4, Item 15) on external communications box A11 (Figure 4, Item 2). Secure with 14 new lockwashers (Figure 4, Item 14), and screws (Figure 4, Item 13). 9. Lower and secure cover (Figure 4, Item 1) of external communications box A11 (Figure 4, Item 2). Figure 4. LAN Cable/External Communication Box – Connect. END OF TASK FOLLOW ON MAINTENANCE 1. Connect battery ground lead, see (TM 9-2350-277-13&P). 2. Set MASTER SWITCH to ON, see (TM 9-2350-277-13&P). Check that electrical system works properly. 3. Set MASTER SWITCH to OFF, see (TM 9-2350-277-13&P). END OF TASK END OF WORK PACKAGE TM 9-2350-277-40&P 0037.1 CHANGE 1 0037.14