TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 248 of 472

ASSEMBLY NOTE See wiring diagram Figure 5, page 0037-6 for installing/connecting of wires to connectors. 1. Install cable W101 (Figure 3, Item 21), cable W102 (Figure 3, Item 22) on faceplate (Figure 3, Item 25). Secure with four bushings (Figure 3, Item 23) and two nuts (Figure 3, Item 28). 2. Install four cables (Figure 3, Item 19) and connectors (Figure 3, Item 18) on faceplate (Figure 3, Item 25). 3. Connect cable W115 (Figure 3, Item 32) to 16 binding posts (Figure 3, Item 31). 4. Install four cables (Figure 3, Item 20) on faceplate (Figure 3, Item 25). 5. Install two caps (Figure 3, Item 26) on faceplate (Figure 3, Item 25). Secure with two screws (Figure 3, Item 27) and new locknuts (Figure 3, Item 24). 6. Install four caps (Figure 3, Item 29) on faceplate (Figure 3, Item 25). Secure with two screws (Figure 3, Item 27) and new locknuts (Figure 3, Item 24). 7. Install faceplate (Figure 3, Item 25) on communication box (Figure 3, Item 4). Secure with 14 screws (Figure 3, Item 16) and new lockwashers (Figure 3, Item 30). 8. Install cable W117 (Figure 3, Item 14) and cable W118 (Figure 3, Item 17) on communication box (Figure 3, Item 4). Secure with 12 screws (Figure 3, Item 16) and new lockwashers (Figure 3, Item 15). Figure 3. Cables – Installation. TM 9-2350-277-40&P 0037 00374