TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 224 of 472
ASSEMBLY 1. Install two catch assemblies (Figure 3, Item 27), two pads (Figure 3, Item 26), six screws (Figure 3, Item 29), six washers (Figure 3, Item 28), and six nuts (Figure 3, Item 23) on box (Figure 3, Item 8). 2. Install two caps (Figure 3, Item 16), two screws (Figure 3, Item 15), and two new locknuts (Figure 3, Item 17) on faceplate (Figure 3, Item 3). 3. Install posts (Figure 3, Item 11) and (Figure 3, Item 13) on faceplate (Figure 3, Item 3). 4. Install connector J22 (Figure 3, Item 38), gasket (Figure 3, Item 37), dust cap (Figure 3, Item 36), four screws (Figure 3, Item 9), and four new locknuts (Figure 3, Item 5) on faceplate (Figure 3, Item 3). 5. Install two connectors J113 (Figure 3, Item 39) and J114 (Figure 3, Item 40), two lockwashers (Figure 3, Item 24), and two jamnuts (Figure 3, Item 25) on faceplate (Figure 3, Item 3). 6. Install two connectors J9 (Figure 3, Item 21) and J10 (Figure 3, Item 22), two lockwashers (Figure 3, Item 24), and two jamnuts (Figure 3, Item 25) on box (Figure 3, Item 8). 7. Install connector J7 (Figure 3, Item 30), gasket (Figure 3, Item 18), four screws (Figure 3, Item 9), and four locknuts (Figure 3, Item 5) on box (Figure 3, Item 8). 8. Install three connectors (Figure 3, Item 19), (Figure 3, Item 10), and (Figure 3, Item 33), gaskets (Figure 3, Item 18), (Figure 3, Item 7), and (Figure 3, Item 34), dust caps (Figure 3, Item 35), 12 screws (Figure 3, Item 9), and 12 new locknuts (Figure 3, Item 5) on faceplate (Figure 3, Item 3). NOTE Use wiring diagram Figure 5, page 0033-7 to assist in assembly. 9. Connect three lead terminals (Figure 3, Item 32) on connector J13 (Figure 3, Item 33). 10. Connect three lead terminals (Figure 3, Item 31) on connector J12 (Figure 3, Item 10). 11. Connect three lead terminals (Figure 3, Item 20) on connector J11 (Figure 3, Item 19). TM 9-2350-277-40&P 0033 0033‐4