TM-9-2350-277-40&P Sustainment Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 178 of 472

92. Install wiring harness (Figure 29, Item 134) on two weldnuts (Figure 29, Item 151). Secure with two clamps (Figure 29, Item 138) and screws (Figure 29, Item 150). 93. Remove three screws (Figure 29, Item 150) and clamps (Figure 29, Item 153) that secure smoke grenade wiring harness (Figure 29, Item 152) to three weldnuts (Figure 29, Item 151). 94. Install wiring harness (Figure 29, Item 134) and smoke grenade wiring harness (Figure 29, Item 152) on three weldnuts (Figure 29, Item 151). Secure with three screws (Figure 29, Item 150), clamps (Figure 29, Item 153), and clamps (Figure 29, Item 138). Figure 29. Smoke Grenade Wiring Harness – Clamping. 95. Install power plant assembly. See TM 9-2350-277-13&P. 96. Connect hose (Figure 30, Item 154) to elbow (Figure 30, Item 116). Secure with clamp (Figure 30, Item 96). Figure 30. Power Plant Hose – Installation.  TM 9-2350-277-40&P 0024 002422