TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 590 of 820

TM 9-2350-277-34 INSTALL ANCHOR KIT (M1059A3 ONLY) — Continued 0087 00 18. Fasten anchor kit items (4) on tarpaulin (1) with three straps (5) that are part of tarpaulin. 19. Wrap tarpaulin (1) over anchor kit items (4). Fasten tarpaulin together with three straps (6) and webbing (7) that are parts of tarpaulin. Use fid (rounded pin) to tuck towlines into tarpaulin. 20. Stow anchor kit on carrier as directed by local authority. Use four straps (2) to secure kit in place. END OF TASK 0087 00-8