TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download

Page 589 of 820

TM 9-2350-277-34 INSTALL ANCHOR KIT (M1059A3 ONLY) — Continued 0087 00 13. Remove two anchors (12) from the cables and towlines of anchor kit. 14. Slide two anchors (12) into supports (7) and brackets (10) on left side of carrier. 15. Fasten two hooks (3) to anchors (12) and tighten wingnuts. 16. Place tarpaulin (1), four straps (2), and fid (3) on flat surface. 17. Place two cable assemblies, six towlines, six shackles, and fid on tarpaulin (1). 0087 00-7