TM-9-2350-277-34 Direct and General Maintenance Manual M113A3 M577A3 M1064A3 M1068A3 M58 Download
Page 505 of 820
TM 9-2350-277-34 INSTALL PERSONNEL HEATER KIT (M1064A3 ONLY) — Continued 0073 00 43. Secure elbow (1) to power plant bulkhead with locknut (2). 44. Secure tube (3) to elbow (1) and elbow (4) with two sleeves (5) and nuts (6). 45. Secure tube (3) to weldnut (7) with clamp (8) and screw (9). 46. Install nipple (10) in personnel heater (11). 0073 00-11 Change 3